Welcome back to LASH Construction’s Community Portal. Here you will find monthly updates on the progress of our Distinction residential condominium project located at 11 Lillian St. (the corner of Lillian and Soudan.) Our goal is to provide the community with an interactive space where we provide updates on our progress, as well as the ability to contact the developer with questions or concerns relating to the project. Please always remember if a situation is observed that is an actual emergency please contact 911.
The sky is the limit at Lillian and Soudan. Residential floor forming is still taking place as we move towards the buildings final model.
Rebar and concrete are still being utilized daily in this phase. Forming trucks will also be utilized during this phase. Concrete wall and column pours are preceded by slab pours. The 19th floor walls, columns, slabs and the Mechanical penthouse will be the goal to have completed this month. Interior blocks will continue upwards and brick façade has commenced along the east and north elevations. Exterior Stud work has started and windows will be delivered and installed up to the 10th floor. Plumbing, sheet metal and electrical work has started throughout. The hoist has been installed and is running up to the 15th floor of the building and the Interior elevator installation has commenced.
As the slabs are formed, they require the most amount of concrete to complete. Generally a day on site when we pour a slab section the physical pouring of the concrete takes the majority of the working day, with finishing continuing on well into the evening hours. It is common, and it is necessary, for this process to last well into the evening hours. Please note that City of Toronto bylaw allows for this necessary step to occur.
There have been some inquiry about this process. As always we are working with all our trades to mitigate any and all unnecessary noise being created.
After a slab is poured, power troweled and finished, wall and column forms are placed on top to reach towards the next residential level; and yet another slab pour. Exterior and interior demising elements are poured at the same time. As well Electricians, Plumbers, and HVAC/Mechanical trades are prepping the walls and slab for future piping/electrical and HVAC connections.
Concrete and Structural Reinforcement Bar continue to be on order every day and will be coming and going from site as necessary.
Contact Us
If you have any questions or concerns about the project or have a generally inquiry please feel free to contact us via the community phone number provided below. If not immediately answered, this phone is connected to an e-mail system that automatically sends a detailed message to our on-site team headed by our Site Superintendent. Please leave a detailed message of your concern and someone will immediately address any concerns on site and get back to you about your inquiry.